4600 Hastings Street Burnaby, BC V5C 2K5
SHOP
INTERIOR LIGHTING
Chandeliers
Pendants
Lamps
Fans
Sconces
Ceiling Mounts
Recessed Lighting
Track Lighting
Vanity Lighting
Lighting Controls
Bulbs
EXTERIOR LIGHTING
Exterior Wall Sconces
Exterior Wall Lanterns
Deck Lighting
Hanging Lanterns
Landscape Lighting
Exterior Ceiling Fixtures
ACCESSORIES
Picture Light
Mirrors
Artwork
BATHROOM ACCESSORIES
Robe Hooks
Soap Dishes and Dispensers
Toilet Paper Holder
Towel Bars and Rings
Tumblers
Wall Niches and Shelves
BATHROOM PLUMBING
Bidets
Faucets
Saunas and Steams
Showers
Sinks
Tubs
Vanities
KITCHEN ACCESSORIES
Grids
Soap Dispensers
KITCHEN PLUMBING
Kitchen Sinks
Kitchen Faucets
RESIDENTIAL
COMMERCIAL
TRADES
SHOP
INTERIOR LIGHTING
Chandeliers
Pendants
Lamps
Fans
Sconces
Ceiling Mounts
Recessed Lighting
Track Lighting
Vanity Lighting
Lighting Controls
Bulbs
EXTERIOR LIGHTING
Exterior Wall Sconces
Exterior Wall Lanterns
Deck Lighting
Hanging Lanterns
Landscape Lighting
Exterior Ceiling Fixtures
ACCESSORIES
Picture Light
Mirrors
Artwork
BATHROOM ACCESSORIES
Robe Hooks
Soap Dishes and Dispensers
Toilet Paper Holder
Towel Bars and Rings
Tumblers
Wall Niches and Shelves
BATHROOM PLUMBING
Bidets
Faucets
Saunas and Steams
Showers
Sinks
Tubs
Vanities
KITCHEN ACCESSORIES
Grids
Soap Dispensers
KITCHEN PLUMBING
Kitchen Sinks
Kitchen Faucets
RESIDENTIAL
COMMERCIAL
TRADES
Return to Catalog
Part Number: 700MOBHSC60BRZ
/ Vendor ID #: 831
Pre-Bent S Curve MonoRail
by Visual Comfort & Co. Architectural Collection
$511.23
Item Sales Info
-
+
Add To Cart
Add To Wishlist
Compare Item
Email
Print
Availability
Dimensions
Height: 0.60"
Width: 0.30"
Finish:
Antique Bronze
Antique Bronze
Satin Nickel
Item Color 1:
Brown
Brown
Clear
Master Color:
Brown
Brown
White
Product Overview
BROWN MO HORIZ. S-CURVE ANT.B
Standard Information
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Bronze
Style:
Contemporary
Option:
Title 20
Refinement Options
Category:
Monorail Hardware
Finish:
Antique Bronze
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2005
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Brown
Master Color:
Brown
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False
Manufacturer Info
Manufactured By:
Visual Comfort & Co. Architectural Collection
To:
From:
Subject:
Hello, take a look at this great item that I found at {storeDesc}.
Send Email
Similar Products
View all
Matched by: